Lagos Reopens 3rd Mainland Bridge Ahead of Scheduled Time

The Lagos State Government on Sunday noon announced the reopening of Third Mainland Bridge earlier than 7 pm scheduled time.

Recall that the Oworonshoki bound lane of the Third Mainland Bridge was closed totally from vehicular movement on midnight on Saturday, February 6, 2021, till 7 pm on Sunday, February 7, 2021, to remove the last expansion joint on the Oworonshoki bound lane.

In a statement released by Commissioner for Transportation, Dr Frederic Oladeindei, t was explained that the closure was vital to enable the contractor to move their equipment to the Oworonshoki bound lane within the given period without any interruptions that could be caused by vehicular movement on the bridge.

Explaining the closure, he stated that the rehabilitation process was being done assiduously to ensure set deadlines are met.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s